
The Trans Bay Cable was installed under the bay floor primarily using an underwater hydro plow operated from the world's largest cable ship, the Giulio Verne. A barge was used in selected areas where the minimum water depth for a ship is not feasible. The cable laying activity had less impact on the bay than a winter storm or typical tidal action.

